When a customer uncovered severe wear on a kiln inlet section during routine inspection, they turned to AC Engineering for a fast, reliable solution. The damage was greater than anticipated, requiring a new section to be fabricated urgently to avoid extended downtime.
Our team began work immediately, using our in-house fabrication capabilities to produce a replacement inlet section within just a few days — meeting the tight turnaround required to keep the customer’s operations moving.
The new kiln inlet section was fully fabricated within our own workshop. Working from supplied dimensions and specifications, our team delivered a durable, precisely built unit that would integrate smoothly with the existing setup.
Thanks to our workshop’s advanced facilities and experienced fabrication team, we were able to manage every stage of production in-house — ensuring both speed and quality without compromise.
Once fabrication was complete, AC Engineering arranged all necessary logistics for delivery and installation. We managed both transport and crane hire, ensuring the new kiln inlet section was lifted and positioned safely on site.
This full-service approach helped the customer minimise delays and disruption while benefiting from a fully coordinated process from start to finish.
The new kiln inlet section was delivered, installed, and operational in record time. By acting quickly and using our own workshop and project resources, we helped the customer stay on schedule and restore performance without unnecessary downtime.